Sewards Coaches
Wesco Systems were recently approached by Sewards Coaches (based in Devon) to undertake a series of electrical works within their workshop. This included the disconnection and removal of their existing lighting, before installing new cabling and JCC Toughbay LED lighting, both at ceiling height and below the mezzanine to provide light for the work benches.
Extra socket outlets were put in, as well as new supplies for air filters ahead of fitting the air filters. All equipment for the new fire alarm system was supplied by Wesco, before our alarms engineers carried out the installation of the system.
All necessarry testing, cetification and instruction was carried out on completion.
3 COMMENTS
Informatika
May 29, 2023, 10:41 am REPLYHow did Wesco Systems come to be approached by Sewards Coaches for electrical works in their workshop? Could you provide details about the specific tasks Wesco Systems undertook, such as disconnecting and removing existing lighting, as well as installing new cabling and JCC Toughbay LED lighting at various locations within the workshop, including both ceiling height and below the mezzanine?
Larry Abend
September 11, 2024, 8:33 am REPLYThank you for sharing your precious knowledge. Just the right information I needed. By the way, check out my website at <a href="https://www.bookunion.us/delete-company?nid=24186&element=http://48u.de/flyingstar/flughafentransfer-frankfurt-ahrbrueck">48U</a> about Airport Transfer.
Matthew Indus
September 28, 2024, 4:16 pm REPLYHey there, I love all the points you made on that topic. There is definitely a great deal to know about this subject, and with that said, feel free to visit my blog <a href="https://other.birge.ru/bitrix/redirect.php?event1=click_to_call&event2=&event3=&goto=http://92n.de/maryam/kosmetikstudio-ginsheim-gustavsburg">92N</a> to learn more about Cosmetics.