• October

      27

      2021
    • 3367
    • 1
    HS2 – Concrete Batching Plants

    HS2 – Concrete Batching Plants

    Wesco Systems Ltd are proud to be a part of one of the largest infrastructure projects in the UK. We have recently delivered the complete electrical installation for 3 x state of the art concrete batching facilities for the C1 package of the High Speed 2 line. The plants are manufactured to an incredibly high

    • July

      21

      2020
    • 7560
    • 15
    Concrete Industry – Installation of new automated block plant.

    Concrete Industry – Installation of new automated block plant.

    WESCO are engaged on the electrical installation of a brand new fully automated concrete block manufacturing plant in Somerset. WESCO were approached after being recommend by the machinery manufacturers following previous experiences with the same processes elsewhere in the country highlighting WESCO’s quality of work and attention to detail. The project is well underway and

    • July

      20

      2020
    • 4947
    • 3
    Aggregate Washing Plant Installation

    Aggregate Washing Plant Installation

    Another plant installation completed, our works included: • Site Supply and Generator installation including automatic changeover system. • LV Switchgear Design, Supply and Installation. • Plant field wiring containment; consisting of heavy duty, lidded steel cable tray throughout. • Plant Motor and Control Field Wiring. • Testing and Commissioning

    • July

      17

      2020
    • 5010
    • 1
    Dairy Industry – Mains distribution upgrade.

    Dairy Industry – Mains distribution upgrade.

    WESCO were engaged to carry out a site survey including energy monitoring prior to arranging an upgrade of the sites electrical infrastructure to accommodate a new production line. Works included the installation of a new containment system and submains to form a new 800A switch room and the extension of another local submain to supplement

    • July

      16

      2020
    • 3788
    • 1

    Data centre works – Various power installations including control system wiring.

    WESCO have been carrying out a variety of work on one of the largest data centres in the South West of England. Works have included MV switch board control cabling, small power and lighting installations, energy management system wiring, panel board sub main cabling installation and commissioning.

    • July

      17

      2019
    • 6618
    • 1
    Safe Silo Filling System

    Safe Silo Filling System

    Our Safe Silo Filling Control Panels are designed and installed alongside customer requirements, to improve the safety of Silo filling procedure. These can be installed on a new Silo installation, or retro fit to upgrade the safety and performance of an existing Silo. A typical installation will include the following: • Silo Filter Control •

Wesco Systems © Copyright 2017 | Terms & Conditions | Website Design by MiHi Digital