Dairy Industry – Mains distribution upgrade.
WESCO were engaged to carry out a site survey including energy monitoring prior to arranging an upgrade of the sites electrical infrastructure to accommodate a new production line.
Works included the installation of a new containment system and submains to form a new 800A switch room and the extension of another local submain to supplement this with a further 800A.
Mains cabling from the switch room to the process control panels was then carried out and in addition wiring to all heavy motors from the control panels complete with stainless steel containment systems.
1 COMMENT
Ilmu Forensik
May 29, 2023, 10:43 am REPLYWhat was the purpose of the site survey conducted by WESCO? Can you provide more details about the energy monitoring aspect of the survey? Furthermore, what were the specific objectives or requirements for upgrading the site’s electrical infrastructure to accommodate the new production line?